Greenway Court
Location: Clarence, NY
Project Description: Complete Master Bathroom Bedroom Remodel
Discover how Remodrn transformed a dated master bath into a timeless, elegant master bathroom.
About the Greenway Court Master Bathroom Remodel
Before
The Challenge
The owners of this master bathroom in this Clarence, NY home wanted to give their relatively new, but dated bathroom a design overhaul. The shower was dated, and dark tile and dark trim made the bathroom heavy and foreboding. Working with the client, Remodrn transformed this master bathroom into an elegant, luxury bathroom that sets the master bedroom apart.
After
Master Bathroom Remodel
After removing the entire existing bathroom, we installed a new vanity and countertop, as well as lights and mirror.
Master Bathroom Remodel
Master Bathroom Remodel
Master Bathroom Remodel
We built a new marble shower wall and shower seat.
Master Bathroom Remodel
We tiled the entire shower walls, floor, and insets.
Master Bathroom Remodel
We installed new tile floor, along with new modern toilet and soaking tub.
Master Bathroom Remodel
We built and tiled custom insets to unify the shower with the soaking tub.
Master Bathroom Remodel
We updated all trim work and windows to white to help lighten the bathroom's design.
Master Bathroom Remodel
Master Bathroom Remodel
The final view of the fully remodeled master bathroom remodel.
The Solution
The steps taken to completely remodel this Clarence, NY Master Bathroom included.
- Demolition – We removed the previous shower, vanity, flooring and toilet.
- Shower Remodel – After removal of current floor, we framed in the new shower wall, curb, insets and seat.
- Tile Installation – We retiled the floor, the shower walls, shower floor, and curb, as well as wall insets.
- Vanity Installation – We installed a fresh new vanity with marble countertop.
- Toilet and Soaker Tub Installation – We installed a new modern toilet and soaker tub for a sleek, elegant look.
- Trimwork – We painted the existing window to white and installed new white molding. A fresh new coat of paint was applied to the entire bath.
- Updated lighting and bathroom fixture installation – Finally, we updated the current vanity light and faucet fixtures throughout the bathroom.